मुख्य सामग्री पर जाएं

  | मौसम…

411 समाचार

In 1989, Kentucky engineers built a 750-foot road base using about 80 tons of ponded fly ash; the 11% ash section was reported to perform well against the conventional control

411 डेस्क☆ सेव करें
In 1989, Kentucky engineers built a 750-foot road base using about 80 tons of ponded fly ash; the 11% ash section was reported to perform well against the conventional control

सारांश

411 AI सारांश — 3 पॉइंट में

इस खबर को पढ़ें:

मूल रिपोर्ट: Economic Times

आपके लिए और