मुख्य सामग्री पर जाएं

  | मौसम…

411 समाचार

Palo Alto built San Francisco Bay’s first horizontal levee to reuse treated wastewater; the 500-foot living slope restores marsh habitat and tests defenses against sea-level rise

411 डेस्क☆ सेव करें
Palo Alto built San Francisco Bay’s first horizontal levee to reuse treated wastewater; the 500-foot living slope restores marsh habitat and tests defenses against sea-level rise

A shoreline defence can be more than a wall. In Palo Alto, California, engineers have built a broad, gently sloping landscape designed to protect the coast while functioning like a living ecosystem.

सारांश

411 AI सारांश — 3 पॉइंट में

इस खबर को पढ़ें:

मूल रिपोर्ट: Times of India

आपके लिए और